I was born in world where equality and stability was claimed as main purpose, that goal attracted millions of people under it's red banners. It is not the idea that fails people - but it's implementation, which resulted in inefficiency, corruption and huge waste. I believe that equality and stability can be achieved along with constant improvement, incorporation of innovation, while constantly performing waste removal.

Enterprises are like small countries and while trying to treat everybody equally, provide stability and measure their own success they, sometimes, fall prey to the same issues: they might miss on opportunity to use diversity, promote talent, encapsulate pride in workmanship and during attempts to measure own success - sometimes start introducing waste to the system in form of unneeded bureaucracy and extensive reporting.

This model is published as Work In Progress. I am strong believer that communities are stronger than any individual and, in current era - when we all are "connected", some great solutions can be created together.

Building rather than rebuilding

Every great idea was already told before and it's a slim chance that in our 60 years of adult life we would be able to say something different than billions before us... and they had couple thousand of years to do that.

Due to size and effort invested in current systems - I believe that recreating might be a wasted effort, and instead we need to focus on what was done good and build on top of it. The only way to do it - is to improve our cooperation, promote talent and single direction/vision, improve pride in workmanship and remove waste.

This model was build with 4 major goals: cooperation, talent, pride and waste removal:

Improve cooperation, by promoting commitment of all participants
  • No pigs and chickens: everybody is involved, committed and responsible
  • Lack of balance and responsibility for the decision - might influence morale and engagement. Everyone should be committed at the same level as we all share the same goal.
  • Every decision is made in pairs, which promotes cooperation and shared responsibility / commitment.
Promote talent and innovation while providing single direction/vision
  • Best people are selected for the job.
  • Nobody knows stakeholder requirements better than person that gathered them, as well as nobody knows technology as technical people.
  • BA provides business requirements knowledge to the team while Tech Lead/ SMEs provide technical leadership and direction.
Promotion of responsibility, involvement and pride in workmanship
  • Pairs have equal impact on the project, which promotes responsibility and involvement.
  • Shared responsibility, removal of waste and promotion of talent - improves pride in workmanship.
Providing visibility of waste and continuous improvement of process
  • Ability to see where things went wrong and improve it in the next cycle.
  • Every decision is recorded, impact is analysed and waste identified (during cycle end).

Model

Model consists of cycles

Provides control over development, adaptability to requirements change and visibility of result

Cycle consists of 4 phases

Phases provides separation of responsibilities and process under control

During 3rd phase - new cycle is started (so-called sub-cycle)

The goal is to provide supply for the next cycle (while current cycle is "constructed")

Length of cycle cannot be less than 2 weeks

Very short cycles won't give enough time to perform all activities efficiently For support tasks – 2 week cycle is allowed, but amount of checkpoints should be decreased to 1-2 Kaizen Lite model is introduced to meet requirements of support tasks

It is recommended that length of cycle won't be longer than 2 month

Long cycles would eliminate visibility and might slide into endless development

Every cycle is both functionality and time boxed

Functionality is important as it delivers value to the customer Time is important as it influences deadline and budget of the product

PM/TL set direction (manage), BA/Tech Lead provide vision (requirements/architecture) and SME/Team provide construction

It is important to select best people for the task. This approach allows using best talent and experience for the task and, therefore, decreases possible waste

Direction, vision and construction is done in "pairs"

Project manager and Team Leader (together) provide direction Business Analyst and Technical Leader (together) provide vision SME's and Team (together) provide construction

Working in pair promotes peer review and cooperation

Cooperation of roles (work in pairs) is crucial part of the model/project as it improves cooperation between business and IT, allows peer review and ensures that needs/constraints of business/technology are taken into account

Milestones

Milestones - are tasks which are needed to be implemented within cycle

Milestones are integral part of the system. It is smallest part (building block) of the project

Milestones are defined by Business Analyst and Technical Lead

BA delivers business requirements and technical lead compiles technical requirements Milestones are put into Milestones log

Recommended maximum duration of milestone is 1 week

Long milestones are hard to design, harder to modify (after requirements change) and are prone to be left uncompleted due to time constraints.

Change in requirements, during development phase, results in its move to the next cycle

Such change require additional requirements clarification and re-evaluation of technical solution/design

Showcase/presentation should be performed after milestone delivery

Presentation improves visibility for business and confirms that it is implemented according to expectations

Functionality first, optimization - after

Milestone should deliver functionality (value for the customer), optimization should be performed after the delivery (during last phase of the cycle) Basic Unit/Integration tests should be delivered along with the milestone Advanced/deep Unit/Integration tests should be delivered after optimization (last phase)

Business Analyst (BA)

Produces business requirements

Business Analysts analyse vision and requirements of Stakeholders and compiles business requirements based on it

Co-produces milestones

Based on business requirements, in cooperation with Technical Lead, produces milestones and adds them into Milestones log

Available for requirements clarification

If some requirements are not clear, unavailability of BA to clarify them - would lead to assumptions and delivery of product not according to expectations

Keep workload under control (remove muri)

Role vital for the project as it provides business view and requirements; therefore cannot be overloaded If needed - some milestones can be moved to next cycle

Technical Lead

Produces architecture / high level design based on business requirements

Analyses business requirements and produces architecture / high level design for milestones / system

Produces technical requirements (for team) based on architecture/design

Based on produced architecture / high level design - produces technical requirements for team to follow

Technical Lead deliverables are reviewed / validated by SME

Working in pairs provide peer review, validation and improves final technical solution

Co-produces milestones

Based on architecture / high level design, in cooperation with Business Analyst - produces milestones and adds them into Milestones log

Develops POC's, prototypes and shared services

Confirms high level design/architecture solution and provides practical examples for other team members

Provides unified technical view/direction for project/service

Defines technical direction for project and components/services of the system

Available for requirements clarification

If some requirements are not clear, unavailability of Tech Lead to clarify them - would lead to assumptions and delivery of product with incorrect implementation

Keep workload under control (remove muri)

Role vital for the project as it provides technical direction/vision for whole project; therefore cannot be overloaded If needed - some milestones can be moved to next cycle

Project Manager (PM)

Co-manages direction of the project

Along with Team Leader - manages/controls direction of the project

Communication with business regarding project progress

Communicate to the business progress/risks/issues/waste

Tracking waste of the project (business) and compiling recycle plan

Provide detailed log of waste on business side and co-created recycle plan during cycle end (last checkpoint)

Can manage few projects

Teams are meant to be self sufficient and amount of managing should be kept at minimum Load (per project) for Project Manager is relatively low, so it is allowed to work on few projects at the same time

Team Leader (TL)

Co-manages direction of the project

Along with Project Manager - manages/controls direction of the project

Communicates with Developers regarding changes/decisions/progress of the project

Communicate to the team progress/changes/decisions/risks/issues/waste

Tracking waste of the project (technical) and compiling recycle plan

Provide detailed log of waste on technical side and co-created recycle plan during cycle end (last checkpoint)

Can manage few projects or perform technical responsibilities

Teams are meant to be self sufficient and amount of managing should be kept at minimum Load (per project) for Team Leader is relatively low, so it is allowed to perform SME's responsibilities or work on multiple projects

Subject Matter Expert (SME's)

Provides technical validation / assistance to Technical Lead in defining architecture / high level design

Working in pairs provide peer review, validation and improves final technical solution

In cooperation with Technical Lead or another SME defines low level design

Working in pairs allows to perform peer review and remove possible technical waste

Develops POCs, prototypes, shared services and works directly on implementation

Confirms design solution and provides practical examples for other team members

Is selected for role based on skills and experience to provide unified technical view/direction and technical expertise

The main responsibility of this role is to drive technical implementation for whole team and provide technical expertise/advices/trainings(if possible)

Works together with the team on implementation and is involved in daily meetings

As part of construction group - involved in construction / implementation

Team

Team is self organization "role" which is responsible for implementation

Is most vital part of every project as it translates "need" into "result" and is responsible for delivering value to the customer

Team is self organizing and independent role

Promote responsibility, involvement and pride in workmanship Avoids micromanaging (although Team Leader might help in providing some direction)

Size of team should be relatively small to keep it lean and agile

Keeping team small improves management, communication and cooperation

Team should have daily meetings to keep everybody updated

Daily meetings provide synchronization on work done, issues and allows avoiding development conflicts TL compiles daily meeting notes based on feedback of team members before daily meeting Daily meetings are capped at 15 minutes and should be interrupted afterwards (meeting notes should be sent and would allow to catch up)

Keeps constant contact with Business Analyst and Technical Lead

Constant cooperation with BA and Tech Lead would allow to deliver according to business expectation and according to best technical solutions

While ideas / decisions are vital for survival of the project / company, unlike any physical entity, decisions / ideas cannot be measured and are compared solely against common sense / opinions of other people.

Also given that current projects are huge and one person might not be able to take into account everything - this model promotes for roles to work in cooperation with each other. Cooperation is vital part of this model, and failure to follow it - would lead to failure of it in your project.

Pairs

Vision

Vision for the project is created by pair Business Analyst and Technical Lead

Direction

Direction for the project is controlled by Project Manager and Team Leader

Construction

Construction / implementation of the project is performed by SME's and Team.

Responsibilities

Business Analyst
  • Compiles business requirements
  • Co-creates milestones
  • Milestones log co-owner
Technical Lead
  • Creates architecture / high level design (with support from SME)
  • Compiles technical requirements
  • Develops POC's, prototypes and shared services
  • Co-creates milestones
  • Milestones log co-owner
Project Manager
  • Co-manages direction of the project
  • Risks log co-owner
  • Debt log co-owner
  • Recycle plan co-owner
Team Leader
  • Co-manages direction of the project
  • Risks log co-owner
  • Debt log co-owner
  • Recycle plan co-owner
SME's
  • Supports Technical Lead with architecture creation
  • Co-creates low level design
  • Develops POC's, prototypes and shared services
  • Involved in implementation
  • Issues log co-owner
Team
  • Responsible for implementation
  • Issues log co-owner

It is assumed that project was “shaped” before starting development cycle: business modelling was concluded (scope, definition, budget, schedule etc.).


Requirements compilation (both business and technical)
Planning and preparation for construction / implementation
Construction of the milestones
Delivery of the milestones

Requirements (egg)

  • Compilation of business requirements
  • Creation of architecture / high level design
  • Definition of technical requirements
  • Filling up of Milestones log

Planning (pupa)

  • Revision of recycle plan
  • Definition of milestones per current cycle
  • Working with SME / Team to assign milestones and prepare estimations
  • Risks definition

Construction (metamorphosis)

  • Daily progress update
  • Definition of low level design
  • Implementation of the milestones
  • Brief showcase of milestones

Delivery (birth)

  • Presentation of delivered milestones to BA/Technical Lead
  • Optimization and additional unit/integration tests development
  • QA and Deploy
  • Reflection upon cycle and recycle plan definition

Debt

Debt is tracked per entity (business / IT)

Will allow to separate two types of waste and analyse/address them in more efficient way

Debt owners are PM (business) and TL (technical)

In case of questions – they are first contact point and can make final decision about respective debt

Secondary debt owners are BA (business) and Tech Lead (technical). In case first contact point is not available – secondary contact point can answer questions and make final decision about respective debt

Setting limit for debt is not mandatory, but if one is set – after meeting it – restart of cycle is required

Limiting amount of waste per cycle allowed is good idea and would allow restart cycle with “clean sheet”

Pairs principle applies in here as well. It is crucial to have agreement from both sides and without mutual agreement – debt is not modified.

If possible/current waste was identified by Vision team - they make mutual decision about adding it to the Debt log

Example: if BA wasn't able to finish with business requirements and requested for this milestone to be included in current cycle – waste is on business side and should be added to business debt.

Example: if Tech Lead wasn't able to finish with technical requirements and requested for this milestone to be included in current cycle – waste is on technical side and should be added to technical debt.

If possible/current waste was identified by Direction team - they make mutual decision about adding it to the Debt log

Example: if PM requested to perform additional and/or undefined report (additionally to existing ones / above standard requirement) – waste is on business side and should be added to business debt.

Example: if TL haven't submitted check-list for code review and requested to perform it without one – waste is on technical side and should be added to technical debt.

If possible/current waste was identified by Construction team - they make mutual decision about adding it to the Debt log

Example: if Technical Lead offers solution with which SME's / Team does not agree, but are requested to implement it – debt is recorded.

Example: if SME offers implementation with which Team does not agree, but are requested to implement it – debt is recorded.

During final phase of cycle – debt should be analysed and waste removal strategy should be set for next cycle

Debt analysis is not just one of the most important aspects of final phase, but the whole cycle as well

If the same items appear in debt log more that two cycles in a row - process should be analysed and improved

And please don't forget - be nice!

Goal of debt is not to track somebody's mistakes, but is to track waste so we won't have to go through the same issues the next time


Checkpoints


Checkpoints are meant to help you evaluate current situation and update risks, issues and debt log.

Debt log owners (Direction pair) should participate in every checkpoint. Meeting should have predefined duration. By default every phase is ended by a checkpoint:

Requirements (egg):

Recommended duration is 1h. Pair BA+Tech Lead (with PM+TL) analyse progress so far and discuss/update risks, issues and debt log.

Planning (pupa):

Recommended duration is 2h. PM+TL with BA+Tech Lead analyse progress so far and discuss/update risks, issues and debt log.

Construction (metamorphosis):

Recommended duration is 2h. Team+SME's with PM+TL reflect upon progress so far and discuss/update risks, issues and debt log.

Delivery (birth):

Recommended duration is 4-8h. Everybody reflects upon progress so far and discusses/updates risks, issues and debt log. Next step - would be final vote of debt value (details in logs section). Afterwards - all logs should be analysed and recycle plan should be compiled. It is important to look at dynamics in all logs (between phases) and trace risks which became issues; issues which left unattended and generated debt; and debt which was valued as low but turned out to be very high.

In case when cycle length is set to 2 weeks - it is recommended to at least keep last checkpoint and decrease it's duration.

Every additional checkpoint can be set depending on project needs.

Usually every log is available for everyone, but update is performed by log owners; by their own volition or by request from other member. That brings benefits as owner might ask additional questions, provide addition opinion/view and would be aware of all items in the log. Consequently this would allow for everybody to have single contact point regarding items in the logs.

Even though every log have it's owner – Direction pair could frequently review them and discuss it with owners.

If it wasn't done during phases - it is advisable to update logs during every checkpoint, which means, by default, that they should be updated at least 4 times per cycle.

Milestones log

Milestones log owner is Vision pair. Amount of milestone details is defined on per project basis: for short cycles and cases where developers have good understanding of business and technical requirements – amount of details can be kept to minimum, but as amount of milestones and/or size of time rises – it is very important to provide sufficient amount of details (might need consultation with a Team). It is better to overdo rather than provide too little information.

Risks log

Risks log owner is Vision and Direction pairs. Risks log can be filled according to any preferred Project Management standard template.

Issues log

Issues log owner is Construction pair with possible support from Direction pair. Issues log is filled according to any preferred Project Management standard template.

Debt log

Debt log owner is Direction pair. Every debt log should keep description of the debt (enough to identify it to outside party) with 3 values: perceived debt value (provided by requester), perceived debt value (provided by Direction pair) and final value - actual debt value - would be defined and entered during last checkpoint. During said checkpoint meeting – every item in debt log is voted (by everyone) and actual debt value is entered. By doing so - we could visualize the difference between perceived debt (during development) and actual debt of the project which, in turn, would allow us to identify "icebergs" and "overblown" debt and compile Recycle plan accordingly.

Recycle plan

Recycle plan owner is Direction pair. It is the one of the most important part of delivery (birth) phase and it is strongly advisable to include everyone in discussion and brainstorming sessions. Risks and issues logs (from all checkpoints) are analysed, as it is important to understand which risks turned into issues and, consequently, which issues created debt. After debt log goes through voting and perceived debt was compared (by everyone) with actual debt - improvement plan is compiled. Debt log serves as main source of information and ordering for recycle plan.


It is very important to visualize your current process to see work done and make adjustment when needed. By visualizing you will be able to see process more clearly, you will be able to visualize impact of issues on your project and track waste more effectively.

There are a lot of online tools out there, which would allow you to visualize your work flow and it is highly recommended that you select one (which suits you best).

Kanban method

As you've seen by now - this model inherits features from few existing methodologies / processes / models one of which is Lean process; Kaizen model is highly focused on waste tracking and removal, which is one of the priorities of Lean process as well. Kanban method works well with Lean and, by inheritance, works great with this model as they share the same goal.

It is very advisable to use Kanban method and Kanban board with this model, as it would help focus on topics that are outside of scope of this document and significantly improve organization / visibility which, as a result, would substantially improve efficiency of process as a whole.

This chapter was meant to share experience and advice to increase delivery of value and decrease waste

I really hope that this chapter would significantly grow over time...

DO's

(deliver value)

Business

Group teams by interests to increase productivity

When people share same interests and goals, they become connected to their co-workers - which usually leads to more positive work atmosphere and experience

Don't get carried away with documentation. Gigabytes of useless files won't help understand system. Keep it short and simple, and utilize Wiki as much as possible

Big amount of documentation with no proper search system increases learning curve and amount of time spent with no guarantee that needed information would actually be found

Failure to find relevant information would require to contact somebody in order to get it, which, consequently, creates additional unplanned workload on that person and creates dependency for the project

Incorrect/outdated document might lead to incorrect solutions and implementations

Monitor market and select decisions according to current practices and available resources within the company/market

Sometimes it is better to use little older technology instead of spending huge amount of time recruiting people with right knowledge

Some newest technologies might not be ready for that specific usage

Do self assessment often

The cheapest way is to ask another(more experienced) department/entity to look at your current processes and procedures.

Try to get feedback from your partners as they might be able to evaluate your entity from different perspective

Talk with newcomers (especially with >5 years of experience) and ask what they think about current processes/procedures

During first few month every small detail/change is very visible for newcomer and you might want to reuse that fact to improve your process/standards/procedures/tools etc.

Every newcomer comes with their experience from previous workplace and might offer solution to the your problem which was already successfully tackled there

Close the understanding gap between Business and IT, as it would increase understanding and cooperation between them

For those who are interested - teach engineers business side of the company

For those who are interested – provide some basic technical seminars

Understanding business goals and what brings value for customer might improve final product produced by engineers

Understanding basic technical limitations/constraints/challenges might make requirements, produced by business, more feasible and easier to implement

Invest into HR and do not overload them

Selecting right people requires effort, time and proper procedures

Right people would require less management, would be more motivated and would deliver better product with good quality

On other side – incorrect people would require more managing, would be unsatisfied and unhappy and might not be able to deliver good quality

Promote pride in workmanship

"Tie" process with positive emotions and unite everyone under single goal

Pride in workmanship increases involvement and productivity

Improves cooperation as everybody share the same goal

Enterprises and innovation - get maximum benefits with minimal impact

It is easier to change 20% of company by 80%, than change 80% by 20%

Due to size - experiments cannot be performed on huge scale. Start with small entities as proof of concept

Enterprises are slow to change due to size, and change should be started at most agile/lean/adaptive entities and slowly spread across the company

Entities are most eager to change - absorb change most efficiently, others - not so much

Due to their eagerness to change and adaptability - experience of successful entities might not be completely copied to less successful ones

During application of experience of most successful entities (that 20%) - adapt solution on the fly to meet demands of 80%. Not everyone has capacity/experience/skills to change as quickly and efficiently as the most successful ones

It is very beneficial to have guidelines for roles

Guidelines would shorten learning curve and would allow to work more efficiently for newcomers

Guidelines would allow to avoid responsibility conflicts, as it would clearly state most important responsibilities and guide its implementation

Control the direction of the meetings

Meetings are great way to share knowledge and communicate between group of people, but if it goes out of the control, in future, it might hurt cooperation

Meeting chair should be trained to control and mitigate possible issues during the meetings

IT

Invest into teaching and skills of your resources

IT is constantly changing and just in five years technology may become deprecated, that's why it is important to invest constantly into skills of your resources

Technical presentations/seminars to improve presentation skills for those who want

Tell me and I'll forget; show me and I may remember; involve me and I'll understand

Showing/presentation alone isn't the most effective form of training

Showing/presentation should be used in conjunction with practical exercises during or right after the training

Create atmosphere of achievement

Creating proper atmosphere would drive people to constantly innovate and create better products

It is very tricky, but with right team and atmosphere - will promote creativity and innovation

Try to define shared services and implement them during early stages of construction

This is place where most implementations miss opportunity to simplify system and should be part of strategy for every project

Shared services would provide guidelines, increase efficiency and decrease time/budget of the project

As it was proven by industry more than once – create API first, as it would simplify usage and cooperation between teams

Keep API simple and avoid exposing internal implementation

Outside teams should be able to use it without additional explanation and won't be needing to gain knowledge of underlying system

Involve employees into problem detection as well as solution search

Employees have first hand experience with those problems as they fight them on daily basis

Experience fighting those problems on daily basis provides them with needed expertise to offer effective solution

The greatest ideas were already shared long time ago (don't generate ideas for ideas sake), instead focus on great implementation

Try to focus not only on ideas, but also ask people about what value they can bring to customer (in short/mid/long term)

Ask for ideas together with it's implementation/direction, as one cannot be done without the other

Process starts with right idea, but it is completed only with right implementation

Use consultant services wisely

Involvement and investment into whole lifecycle of the product is important and would allow to make best decisions

Please be aware that outside consultant might not have complete understanding of the company's infrastructure, so additional training might be needed

If consultant is affiliated with some outside company – require proof of concept and integration with all existing services, as it is place where it fails most often

Select product/systems/services not only based on "adoption" budget, but also calculate "demise" budget for previous one

Adoption of new product/system/service is often connected to demise of previous one and should be measured

If new product/system/service won't be replacing but would served as addition – it would be needing additional support/resources and, again, should be measured

Performing changes while keeping in mind big picture

It is recommended that analysis to be performed not for task at hand - but for whole system

It is dangerous to create “local” solution which might increase complexity or even break existing system

For support tasks - please use Kaizen lite

DONT's

(remove waste)

Business

Complication brings additional challenges and expenses. Keep it simple.

Every additional element in the system/process requires additional maintenance/resources/support

Complicated system require more reporting / measuring / evaluation / planning and would require more support and maintenance

Perform knowledge transfer according to best process/procedures/policies

Chaotic knowledge transfer process might lead to incorrect implementation and consequent service failure

Everything is subjective - even learning process: we remember only our understanding of subject, but that might be a little different than author meant. With every subsequent retelling of the same story - additional elements are introduced to it. Please get knowledge from source if possible (from qualified trainer).

Performing responsibilities of other side might lead to failure/waste

Everyone is selected based on skills/experience need and failure to utilize that leads to failure/waste

Business cannot define technical architecture/design as they are not committed nor are responsible for it. Also they might not be fully aware of current technical requirements and technical solutions

IT cannot define business process/procedures as they are not committed nor are responsible for it. Also they might not be fully aware of current requirements and market

Avoid running IT as cost center

Saving money at beginning might result in more extensive/expensive support needed

Try to simplify, optimize and this would result in doing more with less

Both sides should work on same goal and stop giving answers based on what they think is expected from them

IT should stop saying “no” to everything, as this would lead to loss of competitiveness. Keep it balanced

Management should stop saying “yes” to everything, as it would lead to impossible projects and loss of money and competitiveness. Keep it balanced

Remember that reports does not bring value to customer

This is one of the biggest waste of enterprises. Keep it simple and short

Reports should be defined by Management before they are requested - as IT doesn't know what values are important to the business

Management should perform analysis of current/available systems and requests report which is possible with current infrastructure or request to create one (as separate project with separate budget)

Keep track of assignments set to the team

Sometimes assignments are given without synchronizing with others - which creates invisible overload on resources and might lead to failure of projects

One small task might not have big impact, but as experience shows - amount of tasks only grows with time and might be source of overload and waste for current project

Usage of few reporting tools at the same time provides additional stress as it requires constant attention, synchronization and time - and should be avoided as much as possible

Use appropriate process for appropriate project, don't overkill

Use formal process for middle and big projects

Use less formal process for small project, as usage of formal methods might result in project going over deadline/budget while not bringing any benefits

Be very carefully how you choose your first people for project as they will define direction/implementation of the project

Keep in mind that people promote people with skills similar to the ones they have

Every subsequent addition would be focused on learning rather than defining project

Meeting does not bring value to customer

They are vital for every project, but keeping them to minimum is essential

Too frequent meetings, which doesn't bring value to the team, might be exhausting and might impact quality

Get feedback from participants about frequency of meetings and define it based on needs and wishes

Define, where applicable, guidelines as they might guide meeting direction

Don't put people out of their comfort zone

Practices used in Business might not work as well in IT

People working in Business and IT might not have the same interests, so try to adapt to each needs and provide comfortable atmosphere for everyone

Do not overload people

Overload is almost guaranteed source of waste

Perform assignment tracking and load tracking to properly assess load on a person

If no tracking system is available – get frequent feedback from every member directly

People like to work with the ones they feel comfortable with

Due to lack of understanding / limited cooperation - sometimes Business is not comfortable working with IT directly which, later, might result in waste

Try to manage atmosphere and cooperation between entities - so it would promote efficient cooperation

If business requirements were not transferred properly because of it – project/product and, consequently, business would suffer

Don't search panacea in fancy names and new versions

Sometimes update (new version) doesn't bring new features, but in the end it just increases complexity and decreases visibility

Migrating to new product should be justified by creating extensive proof of concept, not only by numbers provided by manufacturer

Marketing material have goal - sell. Please advise with SME's before making decisions

Adding people at late stage won't improve delivery date

Training, requirements clarifying, realigning of tasks, knowledge transfer and additional management require time and investment of current members

The reason behind late delivery - is lack of time/resources and increasing load on those people would only make delivery even later

Don't promote people to higher position to improve entity image “on paper”

People with not enough skills/experience might deliver/provide incorrect service and/or lead project into incorrect direction

People with not enough skills/experience would require more time to perform activities

Incorrect/inefficient knowledge might be transferred to other members and would increase waste generation within organization

Do not push/demand but provide/offer

First entity shouldn't demand knowledge of it's processes from second entity, as they have their own processes to follow and deadlines to keep

Instead of demanding – provide knowledge transfer/meetings for both sides to understand processes within each entity better

Don't follow manufacturing methodologies to letter

In manufacturing you are creating one product many times, where in software development you create new product every time

In manufacturing – before product is produced – single extensive R&D is performed, while in software development it is performed along with every implementation

Success is not exclusive domain of one entity (or don't take pride in workmanship)

Success is defined by numbers and sometimes the one who produces them tends to put it in it's favour

Taking full credit for success takes pride in workmanship from those who were involved in it

Because of above - decreases involvement, cooperation and quality of delivery

Not telling employees about their weaknesses/issues deprives them from opportunity to improve

If person haven't told that something is wrong - that person is right to assume that everything is done correctly and should be continued

Knowing your weaknesses/issues allows you to spend time on minimising/improving them

It is very sensitive matter and should be handled carefully

Conflict of responsibilities

The bigger the company - the most likely that occur

Might be significant source of business waste as some people won't know who to listen and what to do

Conflict of responsibility results in confusion, duplicated solutions, multiple decisions and not working solutions

Responsibilities should be clearly defined (on paper) and should be available for everyone to read (not only for that role)

During definition of responsibilities - other roles should be checked if there is no conflicts

If you feel that you have to choose lesser evil - re-evaluate process from the beginning

Ending up with only bad choices means that (in any case) bad choice would be selected, and it is irrelevant that it was "lesser" evil

Process which lead to bad choices only - might be flawed and should be re-examined

Endless development

Ability to constantly submit new requirements and get new features is tempting and might result in endless stream of requests and, consequently, endless development

Before project start - describe what functionality is essential and control new feature requests

Predictable amount of work would result in predictable development timeline and deadline

IT

Theory is not always enough, please mix it with practical/successful experience

Knowledge of technology without practical usage might produce waste, as majority of them have limitations which are not communicated ahead

Practical experience would allow more efficient usage of technology

If you feel that you have to choose lesser evil - re-evaluate solution from the beginning

Ending up with only bad choices means that (in any case) bad choice would be selected, and it is irrelevant that it was "lesser" evil

Solution which lead to bad choices only - might be flawed and should be re-examined

Perform proper knowledge transfer

It is important to have single understanding and vision to deliver quality product

Procedure for knowledge transfer should be established

Knowledge transfer require time to prepare, as well as willing and skilled member to perform it

Not every engineer born to be a trainer. Please nominate the ones with relevant skills, talents and will to perform it

Badly engineered shared/common services might be huge source of technical debt

Engineer shared/common services very carefully

If one (bad service) was identified - it should be assigned with high priority and, consequently, rewritten/improved

If some of quality requirements are not possible to meet and those requirements cannot be amended - internal quality baseline might be defined and followed

It is better to follow less demanding (baseline) requirements, than don't follow anything

Requirements which impossible to meet impacts morale and lowers commitment to quality

Due to lack of commitment to quality and lower morale - pride of workmanship might be affected

Peer Review – proceed with caution

If code is checked by person without knowledge of requirements/system/design – waste might be introduced to the system

This model promotes pride in workmanship and claims that code is bad might have negative impact on cooperation between two members

Assemble teams with mixed experience

High amount of junior members in the team would lead to lack of expertise and experience and, consequently, might lead to lower quality of delivery

High amount of senior members in the team would lead to lost opportunity to mentor and knowledge transfer to less experienced members

Instead of Ending

The same as every mechanism consists of same mechanical parts – every methodology have a lot in common. This comes from the fact that they all are trying to solve the same problem while selecting different approaches.

In the world where we don't want have one company to produce everything (monopoly), we want to wear different clothes, drive different cars, have different houses... and just to stay unique – I don't believe that there is something that would fit every purpose. Don't expect this model to work for every company, on every level and for every project - always select what fits best.

This model was meant to bring departments closer, remove waste and improve processes but please don't consider it (or any other model) as solution for problems within the company. Driver which crashed Volkswagen will definitely crash Ferrari as well, and will do it much more faster. Please prepare proper foundation before making any major changes in the processes.


Even if you won't agree with model in general, I really hope you will be able to take something from it to improve processes / cooperation / commitment in your company.

Thank you